VIRTUAL PUBLIC MEETING  |  June 12th–July 11, 2025

Sierra Street Bridge Logo

SSB – Notice of Intent for De Minimis 4(f)

What is a Section 4(f) de minimis impact finding?

  • Park and recreational areas of national, state, or local significance that are publicly owned and open to the public are protected under Section 4(f) of U.S. Department of Transportation Act.
  • The Regional Transportation Commission of Washoe County (RTC), in cooperation with the City of Reno (City), and the Nevada Department of Transportation (NDOT), intends to recommend to FHWA that the effects of the project on Downtown Reno Riverwalk Park and the Reno Whitewater Park are a de minimis impact under Section 4(f).
  • As defined in 23 CFR 774.17, a de minimis impact finding may be made if:
    1. The project would not adversely affect the features, attributes, or activities qualifying the property for protection under Section 4(f).
    2. The official with jurisdiction (City of Reno) is informed of the intent to make a de minimis impact finding.
    3. The public is provided an opportunity to review and comment.
    4. After considering any comments received from the public, the official with jurisdiction (City of Reno) concurs in writing that the project will not adversely affect the activities, features, or attributes that make the property eligible for Section 4(f) protection.

How will the Sierra Street Bridge Replacement Project impact the Downtown Reno Riverwalk Park?

Permanent Impacts:

  • The vertical grade of the paved paths through the park would be slightly modified at both ends of the Sierra Street Bridge to accommodate the new bridge design.
  • Several amenities, including existing trees, pavement, railings, trash cans, and a bike rack, would be removed and replaced.

Temporary Impacts:

  • Along the north side of the river, an approximately 0.14-mile segment of the park would be closed for approximately 2 years between West Street Plaza and South Virginia Street. During this period, pedestrians and cyclists would be detoured around the trail closure along a portion of West 1st Street. The detour would not result in additional distance for users, but travel along West 1st Street may increase travel time slightly versus travel along the trail corridor.
  • Along the south side of the river, an approximately 340-foot segment of the park would be closed for approximately 2 years between Rainbow Street and the east side of Sierra Street. During this period, other segments of the park outside the construction zone would remain open for visitor use.

How will the Sierra Street Bridge Replacement Project impact the Reno Whitewater Park?

Permanent Impacts:

  • Minor regrading of the Truckee River channel upstream and downstream of the Sierra Street Bridge would occur to direct flow around the new bridge pier and avoid sediment build up.
  • The river access ramp at the southwest corner of the bridge would be removed and replaced with a maintenance access ramp for the Cochran Ditch. The new maintenance access ramp will be gated to restrict public access but would be removable to facilitate maintenance crews’ access to the Cochran Ditch.
  • A new river access and takeout point would be constructed on the southeast corner of the bridge restoring access by incorporating an Americans with Disabilities Act compliant access ramp.

Temporary Impacts:

  • A water diversion structure intended to create a dry work zone for bridge construction would extend upstream of the bridge into the whitewater park boundary. Water diversions would be in place from July through October during each year of construction. With permission from permitting agencies, in-channel work and water diversions could be extended to June through November.
  • River users would not be permitted to use the Sierra Street take-out during the 2-year construction period. Alternate takeouts include West Street Plaza or the east end of Wingfield Park. An emergency exit could be available at City Plaza downstream of Sierra Street.
  • Additional restrictions to public river access may be necessary for safety-critical bridge construction activities over the river.

What steps will RTC take to mitigate impacts?

  • Install overhang forms and debris netting on the bridge for over-water work. Netting will be rated to 2000 pounds of drop to prevent construction debris from falling into the river.
  • Establish a safety-critical zone in the vicinity of bridge construction activities. The public will be evacuated from this zone before and during safety critical bridge construction activities.
  • Detour signage would be placed at each end of the Riverwalk closures and would include a visual map, detour directions, and a QR code for users to view the detour route on their phones.
  • Temporary signage will be placed along the Truckee River to warn recreationalists of construction activities and provide sources of information on the project and river access restrictions.
  • Prior to construction, coordinate with the City of Reno and the whitewater community to develop communication protocols in the event of river access restrictions during safety-critical bridge construction activities. If river access restrictions are necessary, communicate with rafting companies in accordance with previously agreed upon protocols.
  • Prior to construction, prepare a Public Communications Plan in coordination with the City of Reno that includes measures to keep the public apprised of recreation facility access restrictions and available river access locations during construction. These measures will include but are not limited to: signage at the project limits, signage at upstream river access points, coordination and communication with recreation outfitters, emails to project contact list, and press releases.
  • Any temporary impacts to the Downtown Reno Riverwalk Park or the Reno Whitewater Park will be restored to preconstruction conditions upon project construction completion.

How can I submit comments?

Comments will be accepted through July 11, 2025. You may submit your comments by:

 

 

Share the Post:

Related Posts

en_USEnglish